Skip to content

Client- Northumberland City Council

Location – Cramlington

Project Summary

Northumberland Highways Laboratory underwent a comprehensive refurbishment and remodelling programme in 2025, with the aim of transforming the existing facility into a modern, high-quality testing environment.

Northumberland County Council (NCC) had a clear ambition to create a contemporary, UKAS-accredited laboratory capable of supporting a significantly expanded range of highways testing activities and strengthening the facility’s role within the regional highways testing market. Lynas Engineers was appointed as the design consultant for the scheme, providing multidisciplinary engineering expertise and coordinating the development of the design from concept through to construction. The project required careful consideration of the existing building, its operational requirements and the technical demands associated with a modern highways laboratory, while ensuring that the refurbished facility could accommodate future growth and increased testing capacity. The appointment also provided an opportunity to demonstrate the strength and capability of Lynas Engineers’ Preferred Partners network. To support the delivery of the scheme, Lynas Engineers appointed Architect Design Studio and JME Consultants to work collaboratively alongside the team. This established an integrated multidisciplinary approach, bringing together architectural, civil and specialist engineering expertise to develop a coordinated design solution.

Working closely with NCC and the wider consultant team, Lynas Engineers supported the development of a practical and technically robust scheme that balanced the requirements of the existing facility with the Council’s aspirations for a modernised laboratory. The collaborative approach ensured that the various design disciplines were effectively coordinated, with interfaces between the building, external works, services and operational requirements considered throughout the design process. The design approach focused on creating a clear and efficient workflow from sample receipt through preparation, testing and storage, while introducing defined operational zones and temperature-controlled environments to meet current standards. The scheme reorganised the existing facility into a cohesive, high-performing laboratory with dedicated testing areas, improved staff and welfare facilities, and enhanced external access and servicing. A dedicated sample drop-off point was established to provide a logical progression through preparation, testing and storage, supported by a large shared testing laboratory capable of accommodating multiple disciplines within a temperature-controlled environment.

Specialist areas, including bitumen testing, drying rooms and wash bays, were rationalised and grouped, with clean and dirty zones clearly defined to improve safety and minimise cross-contamination. The scheme also incorporated a new workshop and store extension with roller-shutter access, an improved staff entrance, upgraded welfare facilities, and enhanced office and meeting spaces. Externally, circulation, drainage and service infrastructure were improved to support efficient day-to-day operations. Collectively, these interventions transformed the fragmented existing layout into a modern, coordinated and future-ready laboratory aligned with current standards and evolving operational requirements.

Challenges:

  • Limited scope for expansion, requiring the existing building to be remodelled and space optimised.
  • Maintaining laboratory operations throughout the refurbishment through careful phasing of works.
  • Integrating new testing facilities and services within the constraints of the existing building.
  • Upgrading the facility while retaining and adapting existing infrastructure.

Sucesses:

  • Demonstrated the Lynas Vision, Personal Design: Remarkable Solutions, through the delivery of a modern, high-performing facility designed to meet future operational requirements.
  • Delivered the project on time and within budget, achieving a high level of client satisfaction

The refurbishment and remodelling programme was successfully delivered on time and within budget, meeting NCC’s project objectives and operational requirements. The completed facility provides a modern, efficient and future-ready environment, with the works achieving a high level of client satisfaction.

Project Gallery

Share This